Monthly Maintenance; External Maintenance; Supply Unit - IDC Mill 5X Mode D'emploi

Fraiseuse
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

C L E A N I N G A N D M A I N T E N A N C E
8.1.4

Monthly maintenance

Checking the zero point
E N
It is recommended to check the zero point once
every month.
▷ Mill a test cube from the test blank.
The test blank is to be used exclusively for test
milling and calibration of the milling machine.
Jäger spindle
The spindle must be in the starting position.
▷ Manually turn the shaft of the spindle through
(at least ten times).
Fig. 28 Turning the Jäger spindle through
8.1.5

External maintenance

External maintenance is necessary after 1000
operating hours. The milling machine software will
inform you appropriately.
66
8.2

Supply unit

8.2.1
Inspections and maintenance measures
Regular inspections:
_ Condition of hoses and drain pipes
_ Filling level of the C/L in the supply unit
When the filling level in the C/L container
has fallen below the minimum level, the
milling program is interrupted and an
error message is indicated.
▷ Fill the C/L container (see page 61).
▷ Acknowledge the error in the software.
8.2.2 Weekly maintenance
▷ Analyse the C/L (see separate analysis instruc-
tions with test protocol).
8.2.3 Half-yearly maintenance
▷ Clean the C/L system (see page 60).
The half-yearly cleaning is indicated by the
program. Upon activation of the system
cleaning, the indication is blanked out
again.

Publicité

Table des Matières
loading

Table des Matières