Preparing The Cabinet - Sun Fire 880 Guide De Montage

Masquer les pouces Voir aussi pour Fire 880:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 41

Preparing the Cabinet

Make sure the operating location complies with the Sun Fire 880 server requirements
and the requirements of the cabinet. See Appendix A of this guide and the cabinet
documentation for information.
1. Be sure the cabinet is stabilized so that the cabinet cannot move or tip forward.
If there are feet beneath the cabinet to prevent it from rolling, be sure the feet are
fully extended downward to the floor.
Stabilize the cabinet using the stabilizing mechanisms provided with the cabinet.
See the instructions provided with the cabinet.
2. Open the front and rear doors.
See the instructions provided with the cabinet.
3. Remove (if applicable) the front and rear doors and the side panels of the cabinet.
See the instructions provided with the cabinet.
Installing the Tray Assembly Into the
Cabinet
To install the tray assembly into the cabinet, complete these tasks:
If necessary, adjust the rear brackets on the tray assembly slides for the depth of
I
the cabinet.
Determine the vertical position of the server in the cabinet.
I
Attach the tray assembly to the cabinet rails.
I
Adjust the Rear Brackets
1. Measure the depth of the cabinet.
Measure the depth of the cabinet from the outside face of the front rail to the outside
face of the rear rail. The tray assembly and server can be installed into a 19-inch
(48.3-cm) cabinet with a depth of at least 32 inches (81.3 cm) and not more than
36 inches (91.4 cm).
Installing the Server Into the Cabinet
en-17

Publicité

Table des Matières
loading

Table des Matières