Dantherm AD 200 Instructions De Service page 12

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation, continued
Connection of
hoses / air ducts
- Dry air
Connection of
hoses / air ducts
- Regeneration air
Warning
CAUTION
Caution
12
The dry air can be blown into the room, or one hose or alternatively two hoses can be con-
nected. Follow these steps in order to connect hoses to the dry air outlet.
Step
Action
1
Decide if you want to connect one
hose (option A) or two hoses (option
B). Check if the position of the con-
necting plate for dry air outlet is in
accordance.
2
If the connecting plate has to be turned follow the next steps.
3
Release thumbscrews at the bottom
and top of the connection plate.
4
Turn connection plate.
5
Retighten connection plate using the thumbscrews.
A hose / air duct (not included in the scope of delivery) must be connected to the regenera-
tion air outlet (see position of the regeneration air outlet in Fig. 1 and Fig. 2).
The optimum length of the hose/air duct is 3 – 5 metres.
Step Action
1
Install the regeneration air hose with a slope away
from the adsorption dryer to prevent that any
condensate probably occurring in the hose cannot
get into the device.
2
If installation with a slope is impossible, drill a hole
(D = 4 mm) at the lowest point of the bend. If water
occurs in the hose due to condensation (in case
of very cold outside conditions) it can drain off
through this hole.
3
Feed the air discharge hose / duct out of the building.
Insufficient device performance due to escaping air
• Fix the connected hoses using hose clamps.
Illustration
A
Illustration
B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ad 300

Table des Matières