Pentair A5300 Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
Tee
Check Valve
Primary
required if
not already
installed
on pump
Water
Flow
through
valve
(The valve
ap opens
away from the
pump outlet)
Back-up Pump
Discharge
FIGURE 3A: METHOD A INSTALLATION
2" Minimum
Tee
Short length of
discharge pipe
(length may vary)
1-1/2"x1-1/2"
Required
Slip Coupling
if a check
Auxiliary
valve is
Check Valve
not already
installed
1-1/2"x1-1/2"
on pump
Slip Coupling
FIGURE 4: BACK-UP PUMP FLOAT SWITCH
EASY INSTALL – METHOD B
1.
Make a second cut in the discharge pipe at the pencil mark
made in Step 1 and set the cut-off piece of discharge pipe
aside. See Figure 5.
2.
Wrap the threads of the close nipple counterclockwise with
2 turns of PTFE pipe thread sealant tape and set aside.
NOTE: There must be a check valve installed in the Primary
Sump Pump discharge between the tee and the Primary
Sump Pump. This will prevent recirculation into the
Primary Pump when the Back Up Sump Pump comes on.
See Figure 5.
SIM979 (06-08-20)
Close
Pipe
Nipple
Elbow
Check
Valve
Assembly
6978 0515
Discharge
Pipe
Hose
Coupling
Cable Ties
and Clamps
1-1/4 x 1-1/2"
Reducers
bushings
(if required)
To the
back-up
pump
discharge
pipe.
Primary
Check
valve
Sump Pump
Discharge Pipe
3.
Thread the check valve onto the backup pump. Make sure
the check flap hinge is up and the flap swings away from the
pump.
4.
Thread the close pipe nipple into the check valve and pump
assembly.
5.
Thread the close nipple into the tee.
6.
Repeat Steps 11, 12 and 13 above
Required if
1-1/2"x1-1/2"
a check
Slip Coupling
valve is not
Auxiliary
already
Check Valve
installed
on pump
1-1/2"x1-1/2"
Slip Coupling
7" Min.
6979 0515
(178mm)
FIGURE 6: DOUBLE PUMP AND FLOAT SWITCH INSTALLATION
Discharge
Pipe
Hose
Coupling
Cable Ties
and Clamps
2" Minimum
Tee
Short length of
discharge pipe
Close
(length may vary)
Nipple
Check
Primary Sump
valve
Pump Discharge
Pipe
FIGURE 5: METHOD B INSTALLATION
Hose Coupling
with Clamps
Coupling/
Check Valve
Assembly
Check
Valve
6980 1016
Long End Faces
Pump, Short End
Faces Tee
Backup
Sump
Pump
6979 0515
Grounded
Electrical
Outlet
12" Min.
(305mm)
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Flotec fpdc 30

Table des Matières