Creation Of Utility Holes On Cladding; Connection To Systems; Electrical Connection; Control Panel Installation - Palazzetti INSERIMENTO SMALL 54T Notice D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6.5 CREATION OF UTILITY HOLES ON
CLADDING
Cladding is to be made only by quali ed personnel.
Utility holes must be made in the cladding for the
following:
A) display slot;
B) ventilation vents;
C) heat release in hood;
D) ventilation of cladding on base;
E) Loading of pellets onto hood;
The holes must comply with the measurements
shown in Fig. 6.5.

6.6 CONNECTION TO SYSTEMS

6.6.1 Electrical connection

Simply connect the stove to the electricity mains
with the plug supplied.
The electrical connection (plug) must be easy to
access also after the stove has been installed.
If the power lead is damaged it must be replaced
electrician to prevent all risks.
6.6.2 Earthing
DANGER
breaker as provided for by current laws (Fig. 6.6).

6.6.3 Control panel installation

The replace's control panel can be wall mounted
using box ( g 6.7.2).
DANGER
Do not install the recessed box on the hood.
Place the passage of the cable between the panel
and the electronic card so that it is not damaged by
the temperature of the replace at normal operating
temperature.
Connect the cable between the terminals of the
electronic card and the control panel before closing
the boxes.
6.6.4 Connection to room thermostat
The stove can be connected to an external timer
thermostat that switches the stove on or off
according to the set temperature.
For electrical connection, refer to the wiring diagram
in the technical speci cations.
34
INSTALLATION
00 4776980 - 06/2018 - PN - Italy
E
2 9
5
2 9
1 1
5
A
C
B
5
E
Fig. 6.5
D
Fig. 6.6
Fig. 6.7.2

Publicité

Table des Matières
loading

Table des Matières