Vortice VORT PROMETEO PLUS HR 400 MP Mode D'emploi page 7

Masquer les pouces Voir aussi pour VORT PROMETEO PLUS HR 400 MP:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ENGLISH
4 4
The
appliance
must
servicing/maintenance purposes. It is important to leave
a space of at least 50 cm in front of the front panel to
facilitate the cleaning and replacement of the heat
exchanger and filters.
Checks on delivery
Check the appliance on delivery for any faults before
proceeding with installation. More specifically:
firstly remove it from the packaging ensuring that the
name and description shown on the box are correct;
When the appliance has been removed from the
packaging, check that there is no visible damage then
make sure that the small condensation drainage hose is
present along with the instruction manual.
Assembly
The appliance comes with two metal brackets for
vertical wall mounting and 4 supports for horizontal
positioning. The equipment required for the fastening of
the brackets is however not provided.
Establish the exact position where the appliance is to be
located bearing the installation requirements in mind.
be
easily
accessible
Vertical mounting on brackets
Fix the brackets to the wall, using suitable rawlplugs
(fig. 5, 6, 7)
5 5
for
6 6
7 7
7

Publicité

Table des Matières
loading

Table des Matières