Cylinder Assembly - Power Fist 8893539 Manuel D'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8893539
INSTALLING THE WEDGE
1.
Raise the beam to the horizontal position and lock it in place with the lock
plate (#12).
2.
Place the wedge (#17) on the beam with the base's bolt holes hanging over
the edge on each side.
3.
Slide a Ø20 x Ø10 x 2 Washer (#10) onto six M10 x 45 bolts. Drop three
bolts into the bolt holes on each side of the wedge base.
4.
Stack the each wedge spacer (#16) on top of the wedge plate (#15) and
align the bolt holes.
5.
Slide the stacked plates onto the protruding
bolts and secure each bolt with an M10 lock
nut (#12). The wedge spacer should be on
the outer edge of the plate to 'trap' the
beam's flange.
6.
Slide the wedge forward and backward to
ensure it has free movement. Adjust the lock
nut tightness if necessary.

CYLINDER ASSEMBLY

The control valve assembly (D) is installed at the factory. It is omitted from the
assembly images for clarity.
1.
Prepare four M10 x 40 Bolts (#21) by
sliding a Ø10 Spring Washer (#9)
and Ø20 x Ø10 x 2 Washer (#10)
onto each bolt.
2.
Place the cylinder's base (#20) onto
the beam (#1) so it rests inside the
two upright supports (see Fig. 3).
a.
Have a second person hold the
cylinder in place while attaching
it to the beam.
3.
Place the wedge protector (#74)
against the cylinder base and align
the bolt holes.
10
12 Ton 3-Position Log Splitter
For technical questions call 1-800-665-8685
V4.0
Fig. 4
Fig. 3

Publicité

Table des Matières
loading

Table des Matières