5.2.

Guided Commissioning

Warning!
The frequency inverter may be connected to power supply every 60s.
More frequent switch-on operations may damage the device.
Disable the frequency inverter; open contacts at enable input channel A (digital input
S1IND/terminal X210A.3) and enable input channel B (Digital input S7IND/ terminal X210B.2)
Switch on mains power. The frequency inverter carries-out a self test.
The setup parameters are selected automatically.
Via the arrow keys up/ down the value of the selected parameter can be changed.
After confirmation of the selected parameter with ENT, the next one is displayed.
Returns are not possible. The commissioning can be interrupted by pressing the ESC key
and be restarted again.
If the setting was changed, the message "SETUP" is displayed again.
Confirm this message with the ENT key to continue the operation.
After initialization, confirm the selected configuration with the ENT key.
Select the parameter with the arrow keys and change the parameter values.
Confirm the selection of the input parameters and the parameter values with the ENT key.
Note:
Depending on the functions, the configurations 700 and 701 have different
commissioning menus.
05/ 2014
When the unit is in " as-delivered" condition, the guided
commissioning procedure is started automatically.
After successful commissioning, the guided commissioning can be
carried out again later via the sub-menu CTRL.
Use the ENT-key to select the parameter
Use the arrow keys up / down to select the configuration.
110: Sensor less control with U/f characteristic
700: Synthetic Network, preset reference
710: Synthetic Network, reference channel