Télécharger Imprimer la page

Installation Instructions - ST Quadrat LUX-top FALZ-PLUS II Manuel De Montage

Masquer les pouces Voir aussi pour LUX-top FALZ-PLUS II:

Publicité

Les langues disponibles

Les langues disponibles

LUX-top
Variant: double standing seam profiles
Variant: roof profile panel
Minimum material thickness:
-
Stainless steel:
-
Copper (a divider layer must be used!):
-
Steel sheeting, galvanized:
-
Zinc:
-
Aluminium:
17 mm
V 03/2019
ST QUADRAT Fall Protection S.A. – Your competent partner for fall protection – www.lux-top-absturzsicherungen.de

Installation Instructions

FALZ-PLUS II
®
0,50 mm
0,60 mm
0,60 mm
0,70 mm
0,70 mm
Mounting on copper only
permitted with EPDM-
stripes (as a separating
layer) available at ST
Quadrat!
(BEMO-FLAT-ROOF and same-system profiles)
i
The carrying capacity of the substructure needs to be checked
before installing the anchor device.
The technical building regulations need to be complied with.
The anchor device may only be installed on substructures which
have been assembled in compliance with the manufacturer's
specifications.
If
the
safety
system
construction needs to be subjected to a thorough structural
and/or static review. The device may not be subjected to
modifications and only original parts of the system may be used.
Installation of the anchor point
1.
Assembly of LUX-top
on the left. Undo the 4 cap nuts on the top of the base
body and move the inserts to adapt them to the respective
roof profile.
2.
Mount the entire anchorage point from above using the
mounted, 2-part aluminium seam clamping rails on the
profile panel / double standing seam band, pull the seam
clamping rails under the rim and tighten the clamping rail
fastening screws to a torque of 50 Nm. Please ensure
that the seam clamping rails are positioned evenly and that
the square of the lock screws is positioned correctly in the
press cut designed for it in the anchorage point.
3.
Align the LUX-top
between the inserts and tighten the cap nuts to clamp the
inserts to a torque of 50 Nm.
4.
After mounting, all screw connections must be checked for
firm fitting. Install / align the anchor eye onto the base
body using the hexagon bolt (M16), the safety washer and
the cap nut. After correct alignement tighten the bolt until
the safety washer lies flat underneath the nut.
or
is
installed
retroactively,
FALZ-PLUS II as given in the picture
®
FALZ-PLUS II base body centrally
®
the
roof
page 1/2

Publicité

loading