Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

A - ENGLISH

AFTER USE

1
Raise the brushes (or pads) and raise the squeegee. Move the machine to a service area.
2
Turn the Master Key Switch (A) OFF and remove the key.
3
To empty the solution tank, pull the Solution Drain Hose (31) off the upper connector. Direct the hose to a oor drain or bucket. Rinse the
tank with clean water. Inspect the solution hoses; replace if kinked or damaged.
4
To empty the recovery tank, remove the Recovery Tank Drain Hose (29) from its hanger and remove the cap (hold the end of the hose above
the water level in the tank to avoid sudden, uncontrolled ow of waste water). The Recovery Tank Drain Hose (29) can be squeezed to
regulate the ow. Rinse the recovery tank and shut-off oat (4) with clean water. Inspect the recovery and vacuum hoses; replace if kinked
or damaged.
5
Remove the brushes or pad holders. Rinse the brushes or pads with warm water and hang up to dry. Allow buf ng pads to dry completely
before using again. NOTE: You need to remove the brushes manually for all SC900 models).
6
Remove the squeegee, rinse it with warm water and hang it up to dry.
7
See Figure 6. Use the Recovery Tank or Bottle Holder storage locations to hang the squeegee from.
8
Check the maintenance schedule below and perform any required maintenance before storage.
9
Store the machine indoors in a clean dry place. Keep from freezing. Leave the tanks open to air them out.
10 Turn the Key Switch (A) OFF (O) and remove the key.
11 Batteries are the most expensive replacement item on this machine. To protect your investment and to get as many cycles from the batteries
as possible, remember the following:
When installing batteries make certain the machine and charger is programed for the correct battery type.
Batteries will last longer if they are kept fully charged.
Batteries will prematurely fail if stored in a discharged state.
Battery chargers will not over or undercharge the batteries.
Every day after use, the battery charger must be plugged in and the charger must be allowed to run through a full charging sequence to
fully charge the batteries. This may take 8-12 hours depending on the battery status.
Always have the charger plugged into an AC outlet if the machine will not be used for a longer period of time to keep the battery(s)
charged.
There is no bene t to discharging to low levels. Do not skip charging because the batteries haven't been fully discharged.
FIGURE 6
A - 18
INSTRUCTIONS FOR USE
Recovery Tank Squeegee Storage Location
Bottle Holder Squeegee Storage Location
SC900 ST - 56091183
11/2015

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sc900 st-28dSc900 st-34dSc900 st-32c561152015611520256115203

Table des Matières