Burner Operation; Burner Start Up Cycle; Three Stage Operation - Riello P 140 T/G Manuel D'entretien

Masquer les pouces Voir aussi pour P 140 T/G:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8. BURNER OPERATION

8.1 BURNER START UP CYCLE

Thermostat
Motor
Ignition transformer
Safety valve
st
1
flame valve
nd
2
flame valve
rd
3
flame valve
Lock-out signal
ALTERNATIVE START-UP CYCLES
1) If you desire the pre-ignition being present during the complete pre-purge phase (37 s): remove the bridge from
the terminals 11 - 3 and put it on the terminals 11 - 7 of the control box.
2) If you desire to reduce the pre-purge period from 37 to 20 s (with contemporaneus presence of the pre-ignition)
remove the wire from the terminal no. 7 to the no. 3 of the control box (maintaining the bridge to the terminals
11 - 3).

THREE STAGE OPERATION

rd
max
3
stage
nd
2
stage
st
1
stage
0
Normal
Lock-out because of no ignition
50
D2896

Publicité

Table des Matières
loading

Table des Matières