Complete Installation

You have completed your panel installation.
For Onsite Factory Commissioning, call Lutron Technical Support and select Startup to schedule a field
service visit. Allow for 10 working days between day of call and scheduled visit.
If you purchased Telephone Startup (LCP128
and Control Station Tables that are located in the back of the Setup and Operation Manual. Once the tables
are complete, call Lutron Technical Support and select Startup. Please call 24 hours prior to desired system
startup.
In the U.S., Canada, and the Caribbean: 1.800.523.9466
In Mexico: +1.888.235.2910
In Europe: +44.(0)20.7702.0657
In Asia: +65.6220.4666
In Japan: +81.3.5575.8411
In all other countries: +1.610.282.6701

Remove Bypass Jumpers

A. After all load wiring has been checked, turn
circuit breakers OFF.
B. Remove and store the bypass jumpers for
possible future use.
C. Turn circuit breakers ON.
All circuits are now set to the default Non-Dim
load type. Non-Dim load types will respond
by immediately going to full ON in any lighting
scene (except the OFF scene).
Notice: Reuse the bypass jumpers whenever
work is being done on a load. Damage caused
by short-circuits and miswiring is not covered
by the product warranty.
Panel installation, control station wiring, and load activation are now complete.
Next Step: Refer to the Setup and Operation Manual to set up the functions and operation of the panel.
®
only), stop here and complete the Control Location, Panel,
TM
Installation Guide for Dimming and Switching Panels
Bypass jumper
DH
DH
DH
DH
H
N
N
N
N
N
Module with 4 outputs shown
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Grafik systems lpGrafik systems ccp

Table des Matières