Completing Installation of the GRAFIK Eye QS Control Unit

1. Mount the control unit in the wallbox as
shown using the four screws provided.
Note: Follow all local and national electrical
codes when installing IEC PELV/
NECR Class 2 wiring with line
voltage/mains wiring.
2. Verify installation:
• Restore power.
• Press the top scene button. The LED will
light.
• Press the zone raise and lower buttons.
Make sure the control unit is dimming all
connected loads.
3. Apply the protective overlay to the control
unit.
Protective overlay
(apply after installation)
For additional information, see the complete installation and operation guide at www.lutron.com/qs
GRAFIK Eye QS Control Unit Quick Installation and Operation Guide
7.9 in
(200 mm)
3.5 in
3.75 in
(87 mm)
(95 mm)
Note: When tightening mounting
screws, make sure that the hinged
cover and faceplate will open fully,
as shown.
Note: To access
micro USB receptacle,
pull down to remove
lower hinged faceplate.