EdilKamin BERING PLUS Installation, Usage Et Maintenance page 32

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 44
Fig. 1
Fig. 2
N
M
fi g. 4
B
C
fi g. 5
E
fi g. 6
D
INSTALLATION
Fig. 3
A
E
D
ADAPTATION FOR PELLET LOADING
SCREW SYSTEM (optional)
The boiler is designed for pellet loading by means of a screw
feeding system.
ATTENTION: the boiler must be positioned at least 30 cm
from the wall behind it
To install the system, proceed as follows:
N.B.:
before starting, turn the boiler off and disconnect the elec-
tricity supply wire.
Figs. 1 - 2
• Remove the cover screwed onto the back of the boiler (fi g. 1),
and replace it with the fl exible pipe connection fl ange con-
tained in the system packaging (M -fi g. 2).
• The fl exible pellet feeding pipe must be connected to the
fl ange (N) (see system technical diagram).
Fig 3
• Insert the level sensor in the special seat on the rear of the
boiler, removing the cap fi xed with two screws.
ADAPTATION FOR PNEUMATIC PELLET
LOADING SYSTEM (optional)
The boiler is designed for pellet loading by means of a pneu-
matic feeding system.
The user must activate loading manually.
ATTENTION: the boiler must be positioned at least 6 cm
from the wall behind it
To install the system, proceed as follows:
N.B.:
before starting, turn the boiler off and disconnect the elec-
tricity supply wire.
Fig. 4:
Remove the steel cover (A) by dismantling the two hinges (B)
and the compass type rod (C).
Fig. 5-6:
Position the plate (D), contained in the system packaging and
fi x it with three screws (E) provided.
N.B.: the plate (D) protrudes 6 cm from the back of the boiler
Fig. 7:
The external unit for drawing pellets must be fi xed to the plate
(D) (see system technical diagram).
fi g. 7
F
- 32
-

Publicité

Table des Matières
loading

Table des Matières