Service Sheet And Check List Aquaciat Ilzh - Ilzc; Maintenance - CIAT AQUACIAT ILZHE 22Z Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Repairs assistance
PROBLEMS
The unit does not operate and there is no display on the CPU card
The CLIMBOX control does not work
When starting one of the heating components, the card displays "INIT"
Service sheet and check list AQUACIAT ILZHE ILZC
"
Cooling test
Date
time
Suction pressure
Suction temperature
Compressor
Compressor
Condensing pressure
Condensing temperature
Gas inlet temperature
Liquid outlet temperature
Exchange coil
Exchange coil
Air inlet temperature
Air outlet temperature
Water inlet temperature
Water outlet temperature
Plate heat
Plate heat
exchanger
Liquid inlet temperature
Gas leaving temperature
Nominal voltage
Voltage at terminals
Current drawn by compressor
Current drawn by fan motor
Anti-frost activating temperature
(water brazed plates exchanger protection)
Check mechanical conditions : pipework...
Check tightness of electrical connections
Clean direct expansion coil
Check control settings
Water differential pressostat

Maintenance

Readings and checks in the above table should be made at least twice a year .
To be sure of proper operation of the unit and benefit from the terms of the
guarantee : take out a maintenance contract with the installer, or with an
approved service company.
Make a visual and auditive verification of the whole installation in operation.
Check that there is no water leak or oil traces around the unit and make sure
+5V 0V +NR
D15
D16
D The fuse of the card is out of order (F1). Fuse located behind the
supply connector (J4).
Type of fuse => 5 x 20 1A delayed
D The card is not supplied with electricity or the voltage is too low, check
the presence of 230V between J4.2 and J4.3.
D Measure the voltages between ref. 0 and +5, then between 0 and +NR,
then contact your After Sales Department.
D Check that parameter P.04 is on 0 and that P.15 is on 1
D Check that the AQUACIAT phase is connected to the ClimBox 2 phase
D The lights D21 and D22 are indicators of communication with the Clim-
Box 2, check their state and contact the After-Sales department. (the dis-
play lights are off if there is no dialogue)
D The voltage drops too much when starting. Check the installation elec-
trical components supply cable section, circuit breaker, etc.)
Bar
°C
Bar
°C
Bar
°C
°C
°C
°C
°C
°C
°C
V
V
A
A
°C
of the correct draining of the condensates waters.
Keep the unit clean and, if required, clean the exchange coil with a product
adapted for the aluminium /copper coils, and rinse thoroughly with water.
Never use hot or cold water under pressure.
Compulsory check each year.
Leak detection on the refrigerant circuit.
23
SOLUTIONS
Measurement point planned on the card
CIAT
01350 CULOZ
FRENCH TRADEMARK

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières