en | 10 | EV2000 Series Wallbox Charger Installation and Operation Manual
Installation and Operation Manual
The updated firmware is uploaded to the DC Wallbox.
The status is displayed on the panel.
3.
When system finishes the update procedure, it restarts
automatically.
579604 | REV. C | June 2020

8.0 Maintenance

Annual Requirements
Replace the ventilation filter.
`
Conduct a visual inspection of the charging cable and
`
ensure that cable does not show any visible damage
or deformation.
Conduct a visual inspection of the charging gun and
`
ensure that gun does not show any isible damage,
arcing, or rust.
WARNING! To avoid danger of electrical
shock or injury, turn off power at the panel
board or load center before working on the
equipment or removing any component.
Do not remove circuit protective devices
or any other component until the power is
turned off.
Disconnect electrical power to the DC
Wallbox before any maintenance work to
ensure that it is separated from the supply
of AC mains. Failure to do so may cause
physical injury or damage to the electrical
system and charging unit.
NOTE:
` Touching the circuit before the main breaker and auxil-
iary breaker are switched off may be hazardous. The
switching device and other apparatus can only be
inspected visually.
` Maintenance of the DC Wallbox shall be conducted
only by a qualified technician.
` After opening the front door, turn off the main breaker
and auxiliary breaker before any maintenance work.
Bosch Automotive Service Solutions Inc.