ENGLISH
MACHINE START AND STOP
Start
Prepare the machine according to the procedure shown in
1.
the previous paragraph.
Lower the squeegee (A, Fig. 15) by pushing the lever (B)
2.
downwards.
Turn the solution low control lever (C, Fig. 15) to one of the
3.
following positions, according to the type of cleaning to be
carried out:
•
: When the lever (C, Fig. 15) is in the "ECO"
ECO system
position (D), the machine works in a special condition
of programmed water "economy" usage; as the water
low is set and constant, the machine can work with a
cleaning time of 70-80 minutes [0.08 gal/min (0.3 liters/
min)].
•
: When the lever is turned to the left
Variable system
(variable low), it is possible to increase the capacity up
to 0.26 gal/min (1 liter/min) (E, Fig. 15).
During machine operation, it is not possible to completely
close the water low to the brush/pad.
Turn the switches (A and B, Fig. 14) to the "I" position.
4.
NOTE
If the green indicator light (C, Fig. 14) turns on, the
machine is ready to be used.
If the yellow (D) or red indicator light (E) turns on, it is
necessary to charge the batteries (see the procedure
in the Maintenance chapter).
While keeping both hands on the handlebar (G, Fig. 15),
5.
start the machine by pressing one or both the activation
switches (F).
Machine Stop
6.
Release the switches (F, Fig. 15).
Turn the switches (A and B, Fig. 14) to the "0" position.
7.
Lift the squeegee by pushing the lever (B, Fig. 15) completely
8.
upwards.
Lift the brush/pad by activating (B, Fig. 16) the transport/
9.
parking device (A) after inserting the relevant pin (C).
14
Figure 14
Figure 15
Figure 16
Operator's Manual - Vantage 17 Battery