Mounting Guidelines
The Model 01917 Automatic Transfer Switch is enclosed in a
NEMA Type 1 enclosure suitable for indoor use only. The
Model 01918 Automatic Transfer Switch is enclosed in a
NEMA Type 3R enclosure suitable for indoor/outdoor use.
Guidelines for mounting the Automatic Transfer Switch
include:
• Model 01918 Automatic Transfer Switch must be
installed with minimum NEMA 3R hardware for conduit
connections.
• Install the switch on a firm, sturdy supporting
structure.
• To prevent switch contact distortion, level and plumb
the enclosure. This can be done by placing washers
between the switch enclosure and the mounting
surface.
• Never install the switch where any corrosive substance
might drip onto the enclosure.
• Protect the switch at all times against excessive
moisture, dust, dirt, lint, construction grit and corrosive
vapors.
The typical installation of the Automatic Power Transfer
Switch is depicted below. Discuss layout
suggestions/changes with the owner before beginning the
system installation process.
Main
Distribution
Panel
Power Wiring Interconnections
All wiring must be the proper size, properly supported, of
approved insulation qualities, and protected by NEC
approved conduit.
Complete the following connections between the generator,
transfer switch and main distribution panel (shown on next
page).
• Failure to follow above warning could cause personal injury,
damage and/or malfunction of equipment.
1. Connect utility power supply leads from a two pole
2. Connect main distribution panel ground to the transfer
3. Connect main distribution panel neutral lead to transfer
4. Connect generator power supply leads from the
5. Connect generator Neutral from the control panel to the
6. Connect generator "GND" from the control panel to the
7. Connect generator utility 240V terminals to transfer
Automatic
8. Tighten all wire connections/fasteners to proper torque.
Transfer Switch
WARNING
Low voltage wire cannot be installed in same
conduit as power voltage wiring.
breaker installed in the main distribution panel to
transfer switch terminals marked "UTILITY
CONNECTION". Use a 50 Amp circuit breaker. Ensure
breaker is turned OFF.
switch "GND" bus.
switch "NEUTRAL" terminal.
generator's control panel to transfer switch terminals
marked "GENERATOR CONNECTION".
transfer switch "NEUTRAL" terminal.
transfer switch "GND" terminal.
switch utility 240V terminals.