Super Finish 23 CR
3.4
TECHNICAL DATA
Voltage :
Fuses :
Unit connecting line :
Max. current consumption:
Degree of protection :
Rated input of device:
Max. operating pressure :
Max. volume flow :
Volume flow at 12 MPa
(120 bar) with water :
Max. temperature of the
coating material :
Max. viscosity :
Empty weight
Hydraulic oil filling
quantity :
Hydraulics housing
Gears (grease)
Max. vibration at the spraygun : lower than 2.5 m/s²
Max. sound pressure level:
*Place of measurement: 1 m distance from unit and 1.60
m above floor, 12 MPa (120 bar) operating pressure,
reverberant floor
230-240 V AC, 50 Hz
16 A time-lag
6 m long, 3 x 1.5 mm²
7.0 A
IP 54
1.3 kW
25 MPa (250 bar)
2.6 l/min
2.3 l/min
43 °C
20,000 mPas
37 kg
1.3 liter
45 g
75 dB (A)*
4
STARTUP
4.1
GUN
1. Screw either the whip hose (1 for injection work) or the
nozzle holder with nozzle (2 for spray work) to the gun.
Before any injection work, remove the filter
that is premounted in the gun, as described
below, to prevent it from becoming blocked.
2. Pull the protective bracket (3) forwards.
3. Screw the grip (4) out of the gun housing. Pull out the in-
sertion filter (5).
4. Screw the grip (4) into the gun housing and tighten it.
5. Latch in the protective bracket (3).
1
2
3
4.2
HIGH PRESSURE HOSE AND PRESSURE GAUGE
To check whether or not the hose is pressu-
rized, the provided pressure gauge has to be
secured to the high-pressure hose.
1. Screw the pressure gauge (11) to the hose connection (A)
or to the gun (B).
11
DESCRIPTION OF UNIT / STARTUP
4
11
5
35