SCS Sentinel OpenGate 3 SAFETY Manuel D'installation Et D'utilisation page 74

Masquer les pouces Voir aussi pour OpenGate 3 SAFETY:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
KEY SELECTOR
INSTALLATION :
1 - place the wires hole in the base.
2 - fi x the base to the wall using screws and plugs (not supplied).
3 - making connections: wires stripping and crimping lugs provided.
Insert the terminals into the legs of the switch.
4 - lift the front cover using the notch.
5 - attach the base and lock using the 2 screws provided.
6 - clip the front cover.
INFO
the key selector has
no polarity.
TRANPONDER
INSTALLATION :
1 - Fix the bottom of the transponder to the wished place Thanks to 2 lived supplied
2 - Connect(Bind) your transponder with your card. Electronics of automatism - Power supply12 or
24 V.
3 - Go directly in front of your electronic case.On the electronic board : Press on P1 and release.
The light DL1 ignites, goes out and Relight.
While DL1 fl ared up again, spend your 1st badge In front of the transponder.
4 - Repeat the operation N ° 3 entirely to program Following badges.
5 - Badges are programmed, you can open your gate.
6 - For cancel, maintain the support on P1 until the light DL1 goes out (approximately 10 seconds).
All the badgesare canceled.
EN ::: 32
CTR 58
DL1
P1
P2
P3
RV1
CTR58
JP3
JP2
CTR 58
DL1
P1
P2
P3
RV1
CTR58
JP3
JP2
24V
key selector
12V
BATT
FS2
FS1
FS3
C
NO
NC
FS4
NO
C
- BATT+
24V
transponder
12V
BATT
FS2
FS1
FS3
FS4
- BATT+
+
-
Power supply
12 V or 24 V
24V
12V
24V
12V

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Opengate 3 comfortOpengate 3 eco energy

Table des Matières