Installation - SCS Sentinel OpenGate 3 SAFETY Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour OpenGate 3 SAFETY:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN

INSTALLATION

> TRACK AND WHEELS.
The rail should have either a round or V shaped profi le. It is imperative that the wheels used are express-
ly designed for the track used. The larger the diameter of wheel used, the freer the running of the gate.
We recommend using wheels with a diameter of at least 120mm.
Ensure that the wheels used are compatible with the weight and size of the gate.
There should be no more than two wheels, in perfect condition and placed near to the extremities of
the gate.
> UPPER gUIDES.
The upper guides should be at least two in number and placed in line with the gate. They should
prevent any twisting during the course of the gate's movement without creating any resistance.
A minimum distance of 170mm should be respected between the guiding rollers.
EN ::: 19

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Opengate 3 comfortOpengate 3 eco energy

Table des Matières