> MAKINg THE KIT CONNECTIONS
Cut off the power supply (disconnect optional batteries) before making any modifi cations.
Implementation, electrical connections and adjustments must be made in accordance
with good practice by a qualifi ed and specialized person.
If you have any doubts about the installation, seek advice !
Wires from limit switch.
Tip
If the motor fails to stop when the mechanical
switch is activated then the two red wires should be
inversed at terminals 8 and 9.
Connection of the motor according to opening direction of gate:
Borne 13
Borne 14
MOT
black
Borne 14
Borne 13
MOT
MOT
Red
Black
EN ::: 26
FR ::: 26
CTR 58
DL1
Diagram as seen from inside the property)
MOT
Red
open at right
P1
P2
P3
RV1
JP3
JP2
open at left
FS2
FS1
(non-solar option)
to transformer
see page 25
(solar option)
Motor
To solar panel
see page 33
(non-solar option)
to back-up battery
see page 33
Connection of the motor
according to opening
direction of gate:
Diagram as seen from
inside the property)
If the motors fails to turn in
the correct direction.
The wires at terminals
15 and 16 should be
inverted.
24V
24V
ou
en
24V
12V
12V
BATT
FS3
FS4
- BATT+