SCS Sentinel OpenGate 3 SAFETY Manuel D'installation Et D'utilisation page 66

Masquer les pouces Voir aussi pour OpenGate 3 SAFETY:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
At this stage of the installation the
motor is not connected and is
disengaged.
> MOUNTINg THE MECHANICAL END STOPS TO THE
RACKS
1) Open the gate completely
2) Position the first end stop on the rack so as to
engage the switch. (Spring figure a)
3) Screw the end stop to the rack using the
counter sunk screws (fastening b)
4) Close the gate completely
5) Position the second end stop to the gate so
as to engage the switch. (Spring figure a)
6) Screw the end stop to the rack using the
counter sunk screws (fastening b)
Correct installation as seen from above.
EN ::: 24
a
fastening
b
fastening

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Opengate 3 comfortOpengate 3 eco energy

Table des Matières