13
ASSEMBLY
13.1
Initial activities
13.1.1 Delivery content
Please check the product contents immediately after receipt for any eventual transport damage or
missing parts. Claims from transport damage or missing parts must be placed immediately after
initial machine receipt and unpacking before putting the machine into operation. Please
understand that later claims cannot be accepted anymore.
13.1.2 Workplace requirements
The workplace has to fulfill the requirements stated.
The ground has to be even, in level and hard. It must be suitable at least to weight it with double
weight per square meter than the machines net weight.
The chosen workplace must have access to a suitable electric supply net hat complies with the
machines requirements.
The machine must be placed in a way that at least 0.8m room free space around the machine.
For longer workpieces sufficient additional place before and behind the machine should be
calculated.
13.1.3 Preparation of the surfaces
Uncoated metal machine parts have been insulated with a greasy layer to inhibit corrosion.
This layer has to be removed. You can use standard solvents that do not damage the machine
surface.
Do not use solvents based on nitrite, aggressive solvents like break
cleaners or scrubbing agents!
These damage the machine surface.
Electric connection
13.2
When working with non-grounded machines:
Severe injury or even death may arise though electrocution!
Therefore: The machine must be operated at a grounded power socket!
The electrical connection of the machine is ready for operation on a grounded outlet!
The feed mains through with min. 16A be hedged.
Check whether the mains voltage matches the requirements of the machine.
A damaged cable must be replaced immediately!
HOLZMANN MASCHINEN GmbH
A T T E N T I O N
www.holzmann-maschinen.at
N O T I C E
ASSEMBLY
34
HBS 230HQ