C3- Motor Fixing - SCS Sentinel SG2 Notice D'utilisation Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Outside opening
Warning !
With outside opening, it is imperative to install a blinker on pillar for safety reasons.
Installing :
• Motor installed to the pillaredge (B = hinge offset)
• Open the gate at 90° (maxi outside opening)
• Present the articulated arm in order to get the
C dimension as big possible. When the master
arm is in contact with the pilllar
dimension of 1 cm.
A: maxi 100 mm

C3- Motor fixing

1. Refer to the Dimension Chart to choose the correct dimensions of the motors and position.
2. Check if the mounting surface of the brackets to be installed is smooth, vertical and rigid.
3. Arrange the cables for power supply cable of the motors.
4. Motor installation and setting for mechanical stopper in opened and closed position.
1) Remove the upper cover and mechanical stoppers
on the bottom of motor.
3) Install the motor on the U-shaped fixing plate with
corresponding screws and nuts.
8
8
3
12
3
12
20
EN
, reduce the C
4) After positioning the front of curved arm on the
bottom of motor, position the minor arm on the
end of curved arm and mounting bracket with
corresponding screws and nuts.
6
6
A
B
2) Place the gate in the full closed position and fix
the U-shaped fixing plate on the wall.
C
B
B
A
A
7
7
C
D
D
10
10
9
5
12
9
12
5

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Mba0051

Table des Matières