C6- Installing - SCS Sentinel SG2 Notice D'utilisation Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Inside opening
Cas n°1
opens second
connection to
Motor 2
Cas n°2
8
3
12
opens first
connection to
Motor 1
The master and slave motors can be installed on the right or on the left pillar.

C6- Installing

Power supply connections
Please kindly notice that the operation of power connection should be carried out
by a qualified electrician with following steps :
1) Make sure the gearmotor is not connected to the power supply before the installation is done.
2) Make sure all the wires are firmly connected.
3) Supply the gearmotor with the power.
8
8
3
12
3
Wire connection slave motor
12
opens first
connection to
Motor 1
6
opens second
connection to
Motor 2
6
C
B
A
P100 PCB2
2
motor 1
Mo1+
Mo1-
(n°5)
(n°6)
white
yellow
P100 PCB2
2
motor 1
Mo1+
Mo1-
7
(n°5)
(n°6)
yellow
white
C
B
A
D
10
9
230V
7
12
D
motor 2
Mo2+
Mo2-
(n°7)
(n°8)
yellow
white
10
motor 2
9
5
Mo2+
Mo2-
12
(n°7)
(n°8)
white
yellow
5
white
M-
yellow
M+
6
EN
7
23

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Mba0051

Table des Matières