Mounting Canopy Hood Above An Island; Disposal Of Packaging And Appliance - Pelgrim LSK 945 Notice D'utilisation

Masquer les pouces Voir aussi pour LSK 945:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Mounting the canopy hood above
an island
4
3
5
1
2
6
Make sure that the ceiling is suitable for the
suspension of the construction chimney.
I
First determine the position and distance
with regard to the chimney. Make a 140 mm
hole in the ceiling for the duct.
I
If the opening for the flex (bottom of the
chimney construction 1) is pointed towards
you, then the control switches will be to
your right.
I
Drill 4 10 mm holes for the plugs and screw
the chimney against the ceiling.
I
Press the 2 flange halves (2) firmly
together, so that the snap connection is
made and then screw the assembled flange
(2) to the canopy hood.
I
Slide the inner cylinder (3) over the
chimney construction up to the ceiling and
fix it with 2 screws (4). Then slide the outer
cylinder (5) on.
I
Fix the canopy hood to the chimney
construction with the 4 M6 screws (6).
I
Make the electrical connection and
observe the flex opening (1).
I
Now fix the outer cylinder (5) to the cooker
hood with 2 screws, this is done from the
inside of the cooker hood.
I
Attach the protective strips over the edges
of the filter in the hood.
I
Remove the film from the filters.
Disposal of packaging and
appliances
The packaging of the appliance is recyclable.
It is made up off:
– cardboard
– polyethylene
– CFC free polystyrene (PS rigid foam)
– polypropylene straps around the box
Please dispose of these materials in a
responsible way in accordance with the
regulations of your local authority.
Your local authority will also be able to give
you information about disposing disused
household appliances in a responsible way.
Technical specifications
See identification plate for technical
specifications.

Publicité

Table des Matières
loading

Table des Matières