Mounting; Mounting Information - Maico PPB 30 O Notice De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

UK | Mounting

9 Mounting

9.1 Mounting information

● Only use slide-in module in wall sleeve with
appropriate incline to the outside wall 
Shell mounting instructions.
● The slide-in unit (slide-in module + exten-
sion duct) must be appropriate for the wall
thickness to avoid a ventilation short-circuit
(lack of air). To ensure this, shorten the
extension duct accurately.
● With wall thicknesses of 500-790 mm, use
the optional PPB 30 VS extension kit. When
installing, use the centring ring provided for
the extension.
● Only mount internal cover on flat surfaces
and without any distortion.
● The appropriate mounting material must be
supplied on site.
● For specified connection cables, also see
connection plans in Appendix:
Grid connection and 230 V input:
Type NYM-J 5G1, 5 mm²
Control cables: Type J-YSTY, 0.8 mm,
4 wires. Max. 25 m from star point, up to
star point max. 4 m
● Imbalance may arise if the maximum stated
cable lengths are exceeded. Observe instal-
lation requirements relating to cable lengths
and types.
● Ventilation units may only be operated using
the voltage and frequency shown on the rat-
ing plate ( RLS 45 O/K). For rating plate,
see RLS 45 O or RLS 45 K control or PPB 30
RC ventilation unit. Operating voltage for
PPB 30 O/K units = 12 V DC.
● PPB 30 O units are connected directly to the
fan interface (Fan1/Fan2) of the RLS 45 O
or RLS 45 K control. For electrical connec-
tion  Wiring diagram.
● PPB 30 K units are connected to the RS 485
bus of the RLS 45 K control. If using seve-
ral PPB 30 K on an RLS 45 K, the PPB 30 K
units should be addressed using the DIP
switches on the board (address 0=unit 1,
36
address 1=unit 2, address 3=unit 3). For
electrical connection and position of DIP
switches  Wiring diagram.
● PPB 30 RC units are connected to 230V/50 Hz
(for electrical connection  wiring diagram).
The control is carried out with DS 45 RC.
● The two connecting cables of the PPB 30
fans (in the slide-in module) are already fully
wired (8-pin, coded connector plug to avoid
mixing up the sockets). They are connected
to the board in the ventilation unit.
● RLS room air control with plug-in connec-
tion terminals for ventilation unit connecting
cables. Connection terminals can be taken
off for wiring.
● When using the sensor-based automatic
dehumidification function, exhaust air mode
runs until the humidity falls 3% below the
maximum humidity value limit. Volumetric
flow compensation with other PP.. units is
undertaken.
● Manually switched exhaust air mode or
manually switched intensive ventilation is
possible on PPB 30 K units with a button
or switch provided by the customer. When
using the switch, the start delay can be set.
The specialist installer can set parameters
for the duration of the manually switched
functions and the start delay using the
commissioning software. Volumetric flow
compensation is undertaken with the other
PP units on the fan interface.
● Manually switched exhaust air mode or in-
tensive ventilation is possible on the PPB 30
RC by means of DS 45 RC or a push-button
provided by the customer. The duration
of the manually switched function can be
parameterised by the specialist installer via
the service mode.
● Exhaust air mode on a PPB 30 O in combi-
nation with an RLS 45 O can be activated
by pressing the "Ventilation level" button
for more than 2 seconds. Exhaust air mode
generally lasts 10 minutes. Exhaust air
mode is only possible with a PPB 30 unit
type setting and when 1 unit is used (setting
in service menu).

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ppb 30 kPpb 30 rcRls 45 oRls 45 k

Table des Matières