1.
2.
3.
3.1
SAFTY MARKING
3.2
3.3
3.4
4.
5.
6.
7.
8.
9.
10.
10.1
TURNING ON THE AUTOCLAVE AND BAROMETRIC ALIGNMENT
10.2
CLEAN WATER TANK MANUAL LOAD
10.3
CHARACTERISTICS OF THE WATER TO BE USED
10.4
LOADING OF THE MATERIALS INTO THE AUTOCLAVE
10.5
10.6
END OF THE STERILISATION CYCLE
10.7
10.8
10.9
11.
11.1
11.2
11.3
11.4
11.5
12.
12.1
12.2
12.3
12.4
12.5
12.6
12.7
13.
OSMOSI SYSTEM INSTALLATION
INDEX
ENGLISH
1