Télécharger Imprimer la page

Camoplast UTV 4S Directives D'installation page 7

Masquer les pouces Voir aussi pour UTV 4S:

Publicité

F. Apply 1 cc of grease all around the bolt head.
Insert dust cap (1) on stabilizer shaft all the way
in, i.e., until it is impossible to remove it by hand.
Refer to Figure 5.
NOTE: Refer to the "Lubrication" section of the
User Manual for details on lubrication of
the stabilizer bolt head.
Figure 5
G. If tracks have been removed, reinstall them on
the systems. Refer to the "Installation of a
rubber track" section of the User Manual.
NOTE: the following steps must be performed with
the tracks installed on the systems. Tracks
will be difficult to install if the steps
described below are already done.
H. Go directly to step M.
F. Appliquer 1 cc de graisse sur la circonférence
de la tête du boulon. Insérer ensuite le
capuchon (1) sur le stabilisateur en le poussant
au fond, jusqu'à ce qu'il soit impossible de le
retirer à la main. Voir la Figure 5.
NOTE : Pour des renseignements sur le graissage
IMPORTANT
G. Si les chenilles ont été enlevées, réinstallez-les
sur les systèmes. Référez-vous à la section
« Installation d'une chenille de caoutchouc » du
Manuel de l'utilisateur.
NOTE : Les étapes qui suivent doivent être
H. Passer immédiatement à l'étape M.
de la tête du boulon du stabilisateur,
référez-vous à la section « Lubrification »
du Manuel de l'utilisateur.
effectuées lorsque les chenilles sont déjà
installées sur les systèmes. L'installation
des chenilles sera problématique si elle
est faite après les étapes décrites
ci–dessous.
©2014 Camoplast Solideal Inc.
Page 7

Publicité

loading

Ce manuel est également adapté pour:

5500-00-0100