Ups Internal Battery Connection - Eaton Powerware 9125 Guide D'installation

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 9125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
Table 10. Right Rail Kit (39J4830)
Quantity
Eaton PN
1
157605899-002
1
157605899-003
1
157605900-001
3
180400027-400
3
180500165-001
3
180500230-001

UPS Internal Battery Connection

NOTE Check the battery recharge date on the shipping carton label. If the date has expired
and the batteries were never recharged, do not use the UPS. Contact your service
representative.
To ensure proper battery operation before installing the UPS:
1.
2.
3.
4
EATON Powerware
Description
Right Fixed Mounting Rail Assembly
Rear Support Rail
Rear Hold-Down Bracket
#10 Split Lock Washer
#10-32 Wing Nut
#10 Flat Washer
Verify that the UPS is off and unplugged.
Remove the UPS front cover (see Figure 1).
Figure 1. Removing Packing Material
Connect the internal battery connector (see Figure 2).
Figure 2. Connecting the Internal Battery Connector
®
9125 (9910-P30) UPS Installation Guide for IBM
®
S
Applications
164201636 Rev A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p30Powerware 39j4816Powerware 103002728-3991

Table des Matières