Eaton Powerware 9125 Guide D'installation page 37

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 9125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.
UPS Only: Plug the power cord provided with the IBM equipment
into the input connector on the UPS rear panel (see Figure 31 on
page 24).
UPS with PDM: Plug the power cord provided with the IBM
equipment into the input connector on the PDM rear panel (see
Figure 34 on page 28).
4.
Plug the other end of the power cord into a power outlet. All UPS
front panel indicators flash briefly and the UPS conducts a self-test.
When the self-test is complete, the
the UPS is in Standby mode.
5.
Press the On button.
μ
The
the percentage of load being applied to the UPS. The UPS is now in
Normal mode and supplying power to your equipment.
To change the factory-set defaults, see "Configuration Mode" on
page 37.
NOTE The batteries charge to 90% capacity in approximately 3 hours. However, it is
recommended that the batteries charge for 24 hours after installation or long-term storage.
If you have questions about implementing non- or dual-redundant power,
the following options are available:
S
www.oem.powerware.com/ibm-ups/pdf/nemadiagm.pdf or
www.oem.powerware.com/ibm-ups/pdf/iecdiagm.pdf
S
Submit your question to "Ask the Expert" at
www.oem.powerware.com/ibm-ups/
S
Submit your question to our FAQ database at
www.oem.powerware.com/IBM_faq/afmmain.asp
S
Contact the IBM office or Business Partner servicing your account
®
EATON Powerware
9125 (9910-P30) UPS Installation Guide for IBM
indicator stops flashing and the bar graph indicators display
®
Applications
INSTALLATION
μ
indicator flashes, indicating
S
164201636 Rev A
23

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p30Powerware 39j4816Powerware 103002728-3991

Table des Matières