Eaton Powerware 9125 Guide D'installation page 27

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 9125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7.
Position two of the pedestals over the edge of each cabinet so that
the weight of the unit is evenly distributed. Secure the pedestals
with the screws provided in the accessory kit.
8.
Carefully position the cabinets upright with the air vents at the top
(see Figure 19 or Figure 20).
NOTE Pedestals are required for one and two cabinet installations. Joining brackets are
required for all tower EBM installations.
®
EATON Powerware
9125 (9910-P30) UPS Installation Guide for IBM
Air Vents
UPS with EBM
Figure 19. Pedestals with Two Cabinets
Air Vents
Figure 20. Tower Setup with Three Cabinets
®
Applications
INSTALLATION
UPS with PDM
S
13
164201636 Rev A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p30Powerware 39j4816Powerware 103002728-3991

Table des Matières