Eaton Powerware 9125 Guide D'installation page 20

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 9125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
The following steps explain how to install the UPS rail kit.
NOTE All hardware (screws, clip nuts, etc.) referenced in Steps 2 through 4 are contained
in the rail hardware kit.
1.
2.
3.
NOTE Do not tighten the screws until the UPS or EBM is installed.
6
EATON Powerware
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 4).
Rear Hold-Down Bracket
Rear
Assembly Wing Nuts
Figure 4. Adjusting the Rail Depth
Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack.
Secure both rails to the front of the rack with pan-head screws.
Insert the screws through the center holes of the rail (see Figure 5).
Figure 5. Securing the Front Rail
®
9125 (9910-P30) UPS Installation Guide for IBM
®
S
Applications
164201636 Rev A
Front

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p30Powerware 39j4816Powerware 103002728-3991

Table des Matières