Eaton Powerware 9125 Guide D'installation page 57

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 9125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.
To prevent electrostatic discharge (ESD), place one hand on a metal
surface such as the UPS rear panel.
Align the Single-Port Card with the slot guides and slide the card
into the slot until it is firmly seated.
4.
Secure the Single-Port Card with the screws removed in Step 1.
®
EATON Powerware
9125 (9910-P30) UPS Installation Guide for IBM
On-Bypass
Disabled
NORM
On-Bypass Relay Jumper
(J3)
Figure 42. On-Bypass Relay Jumper
®
Applications
COMMUNICATION
On-Bypass
Enabled
AS/400
S
43
164201636 Rev A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Powerware 9910-p30Powerware 39j4816Powerware 103002728-3991

Table des Matières