ASSEMBLY STEp 3
TOP HANDRAIL
BOLTS (F)
INCLINE ARM
NUTS (G)
12
HARdWARE fOR STEp 3:
BOLT (F)
25 mm
Qty: 4
Open hardware for step 3.
A
Attach each top handrail to the inCline
B
arm using 4 bolts (f) and 4 nuts (g). To
make assembly easier, lightly tighten all four
bolts to begin, then tighten firmly after all bolts
have been started.
Tighten all hardware from ASSEMBLY STEP 2.
C
NUT (G)
8 mm
Qty: 4