5
Installation check
After completing the installation, check ...
the wiring for completeness, short circuit, and earth fault.
ƒ
the power connection (X23):
ƒ
–
polarity of the DC−bus voltage supply via terminals +UG, −UG
the control connection (X26):
ƒ
–
short−circuiting of the charging current limitation depending on the
power supply module connected.
)
Note!
In the next step the drive system is commissioned.
Relevant information can be found in the detailed documentation
of the power supply modules and axis modules connected.
EDKCSEK002 DE/EN/FR 3.0
Installation check
l
5
57