In order to open the air flow (standard use of the X-Cid
will then raise to the screwed cover's level (see photo hereafter).
A 250 ml bottle TSU oil is sufficient for running 300 lubrication cycles with 3 selected instrument stations (standard
lubrication mode). The oil must be used up within 12 months.
4) Keypad:
■
The control keypad includes the following components:
• A cycle start button.
• Three buttons to select the desired stations.
• Green, yellow and red LED indicators:
- Power on (green).
- Stations selected and cycle underway (yellow).
- Malfunction (red).
INSTALLATION / USE
■
®
The X-Cid
2 must be installed in a well ventilated room. The air exchange rate must be at least 100m
air exchange may be passive or assisted by static extractors, air conditioners, or mechanical extractors. The technician will
provide the end user with advice in this regard.
■
®
The X-Cid
2 is designed to be installed on a horizontal surface, but may be wall mounted using the following method:
• The maximum height of the covers must not exceed 1.50 metres in relation to the floor level so that the removable reservoir
can be easily assembled and dismantled.
• Make sure that the wall can support the weight of the device (approx. 8 kg).
• Place two anchors (rawl plugs) for Ø 5 to 5.5 mm screws in the wall 200 mm apart. The screws must be screwed into the
anchors so that their heads (Ø 10 maxi) protrude 7 mm from the wall.
■
Empty the reservoirs and close the oil reservoir's cover valve before moving the device.
■
®
If the X-Cid
2 is not used for a year or more, it should be inspected by a certified installer.
Année du marquage CE : 2006
Year of CE-marking: 2006
CE-Kennzeichnung: 2006
2), press on the valve on the top of the cover. The cover top
®
Keypad X-Cid
2
®
3
/h per device. The
21
07/13 Ref. 60300544-I