ENGLISH
LAMP (RE)PLACEMENT
In case of replacement of the lamp or
maintenance, do not open the fixture
within 10 minutes until the unit cools
down after switching off. Always unplug
the unit before servicing! Always use the same type
of spare parts (bulbs, fuses, etc.) When replacing
parts, please only genuine spare parts.
Switch off the main supply and unplug the unit.
Wait for about 15 minutes until the unit has been cooled
down.
Open the plastic top cover (4screws) ( n° 1 on the photo
below )
Remove the metal plate that covers the lamp (2screws)
See the drawing ( n° 2 ) for the exact location.
Remove the old lamp (never handle the lamp when it is
hot) ( n° 3 on the drawing )
Attention! Check the label on the backside of the
device or see the technical specifications in this manual
to know which lamp should be used. Never install lamps
with a higher wattage!
Don't touch the bulb with bare hands! This drastically
shortens the lifespan of the lamp. If you touched the
lamp, clean it with a cloth and a little denatured alcohol.
Wipe the lamp off before installing.
Put the new lamp back inside the unit. Be sure that the
wires don't touch the lamp.
Put the metal cover plate back in place and fix it with the
2 screws.
Put the plastic top cover back in place and fix the 4
screws.
Done!
EXCHANGING/ROTATING GOBOS
ATTENTION: Install the gobos only when the unit is switched off!
Never unscrew the screws of the rotating gobo as the ball bearing will be opened. Repairing
this is very difficult!
Switch off the main supply and unplug the
unit.
Open the plastic top cover (4screws)
Locate the gobo wheel and remove the
fixation ring of the gobo you want to change
with an appropriate tool.
Remove the gobo and insert the new gobo.
Press the fixation-ring together and insert it
in the front of the gobo.
Done!
BRITEQ®
OPERATION MANUAL
3/73
ENGLISH
OVERHEAD RIGGING
Important: The installation must be
carried
personal only. Improper installation
can result in serious injuries and/or
damage to property. Overhead rigging
requires
Working
respected,
materials should be used, the installed
device should be inspected regularly
for safety.
Make sure the area below the installation
place is free from unwanted persons
during rigging, de-rigging and servicing.
Locate the fixture in a well ventilated spot, far away from any flammable materials and/or liquids. The
fixture must be fixed at least 50cm from surrounding walls.
The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
Before rigging make sure that the installation area can hold a minimum point load of 10times the device's
weight.
Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
Don't cover any ventilation openings as this may result in overheating.
The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
HOW TO SET UP THE UNIT
CONTROL PANEL:
1. DISPLAY shows the various menus and the selected functions.
BT575S
BRITEQ®
out
by
qualified
service
extensive
experience!
load
limits
should
be
certified
installation
4/73
OPERATION MANUAL
BT575S