Task 5: Setting Up Serial Cable Connections - Promise Technology VessJBOD 1730 Guide De Démarrage Rapide

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 38

Task 5: Setting Up Serial Cable Connections

Serial communication enables the Command Line Interface (CLI) on your PC to
monitor and control the VessJBOD. The VessJBOD package includes a RJ11-to-
DB9 serial data cable.
The CLI is explained in "Task 7: Setting Up the CLI Connection" on page 16.
Figure 11. A serial connector is located on the controller
To set up a serial cable connection:
1.
Attach the RJ11 end of the serial data cable to the RJ11 serial connector on
the controller.
2.
Attach the DB9 end of the serial data cable to a serial port on the Host PC or
Server.
This completes the serial cable connection. Go to "Task 6: Connecting the
Power" on page 14.
Task 5: Setting Up Serial Cable Connections
RJ11 Serial Connector
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Vessjbod 1740Vessjbod 1830Vessjbod 1840

Table des Matières