Important - Ascaso Dream Manuel De L'utilisateur

Masquer les pouces Voir aussi pour Dream:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

The installer must read this manual
carefully before start-up.
The operator should be an adult and
fully competent person.
Should an anomaly occur, please
contact your distributor.
Start-up
Check that the voltage is the same
as that indicated on the machine
nameplate.
water with a low mineral content.
The quality of the water will affect the
taste and quality of your coffee as
well as help avoid future malfunctions.
See our especial anti-lime scale filters
(optional).
Make sure that there is enough water
in the tank. Running the machine
without water may damage the pump.
Water levels should be checked
visually.
Versatile model. Place the discharge
nozzle
filter holder pressure
through this nozzle. If not correctly
placed, all the remaining water could
spill outside the tray.
manual DREAM PID_ES_EN_DE_NL_FR.indd 23
manual DREAM PID_ES_EN_DE_NL_FR.indd 23
Fill the water
tank with
fresh water
(see figure 1).
Check that the
water inlet tube
is immersed in
the tank.
Figure 1
NB!
We recommend using
over the tray
.
24
11
NB! On ending the service, the
is released
7
ascaso
Plug the machine into the electrical
socket.

IMPORTANT

When turned on for the first time,
the machine enters start-up mode.
The pilot light
comes on and
6
flashes while the machine heats up,
until the right temperature is reached.
During this process no service can be
provided.
The screen
21
shows the temperature
rise to the pre-set temperature.
A) Using the machine for the first
time or after a long interval.
Replacing the water in the circuit.
1. Turn the coffee maker on with the
general switch
in position (I).
2
2. Attach the empty filter holder
with a receptacle underneath.
3. Press the coffee switch
approximately half a tank of clean
water flow through.
B) PRIMING.
• If no coffee comes out
• After a period without use
• After making steam
• If the tank has been emptied
The priming procedure should be
carried out:
1. With the coffee maker on, turn on
the steam tap
.
4
2. Turn on the coffee function (3-I)
and release some water (a cup)
through the steam wand
3. Turn off the water function (3-I)
and turn off the steam tap
coffee maker is now ready for use.
C) After producing steam, wait 5
minutes before making coffee. Or
carry out the priming operation, but
let the water flow (point B2) until
13
7
and let
1
.
5
. The
4
23
09/12/2019 11:22:35
09/12/2019 11:22:35

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dream pid

Table des Matières