Wacker Neuson HI400HD D Notice D'emploi page 66

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Setting up the Burner
Continued from the previous page.
3. Install the G 1/8-in. adapter (d) into the pressure port. Install a tube onto the
adapter. The tube (e) must be long enough to reach outside of the heater. Install
a 300-psig (20 bar) pressure gauge (f) onto the tube.
e
4. Close the access cover (a).
WARNING
High voltage, cutting, and hot surface hazards exist inside the machine. High
voltage can cause severe injury or death.
► Use extreme care when working inside the machine.
► Only start/run the machine when the pressure gauge is outside of the machine.
► Only start/run the machine when the cover is in place.
Checking fuel
5. Reconnect the power source.
pressure
6. Set the low fire/high fire switch to the low fire position.
7. Set the mode switch to the ON (I) position. The burner will start. With the
machine running, record the value on the gauge. This is the low fire reading.
8. Set the low fire/high fire switch to the high fire position. Wait approximately
30–40 seconds to allow the burner to switch from low fire to high fire.
9. With the machine running, record the value on the gauge. This is the high fire
reading.
10.Set the mode switch to the OFF (I) position.
11.Compare your readings with the recommended pressures.
Recommended fuel pressures:
Low fire (stage I) = 181 psi (12.5 bar); High fire (stage II) = 217 psi (15 bar)
This procedure continues on the next page.
d
b
66
HI400HD D / HD G
a
f
e
wc_gr012098
ghi_tx001464gb_FM10.fm

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Hi400hd g

Table des Matières