Steinbach BP-39WS-B Mini Mode D'emploi page 36

Masquer les pouces Voir aussi pour BP-39WS-B Mini:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 160
E
300 mm
F
1. Clean the selected installation site with a broom to remove rocks and other solid objects.
2. Install the heat pump exactly as intended for later use.
3. Lay the hoses from the water treatment system to the installation site of the heat pump (see
Fig. F).
Make sure that all lines/hoses leading to the heat pump are not under stress and do not
obstruct any paths.
4. Install a cable for the power supply of the heat pump (see section "Technical data").
Use an extension cord or a socket with a protection class that is suited for the ambient
conditions at the connection site!
The installation site is ready.
36
2120 mm
1500mm

Publicité

Table des Matières
loading

Table des Matières