Check Delivery To Ensure That All Parts Are Included And There Is No Damage; Basic Cleaning Of The Device; Preparing The Installation Site And The Connections - Steinbach BP-39WS-B Mini Mode D'emploi

Masquer les pouces Voir aussi pour BP-39WS-B Mini:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 160
- If the packaging is damaged, replace it with a container of at least equal
quality.

Check delivery to ensure that all parts are included and there is no damage.

1. Open the packaging carefully.
2. Take all parts out of the packaging.
3. Check that the delivery is complete.
4. Check the delivery for damage.

Basic cleaning of the device

1. Remove the packaging material and any protective films.
2. Clean all of the parts included in the scope of delivery as described in the chapter on
"Cleaning".
The device is now clean and ready for use.

Preparing the installation site and the connections

A good choice and preparation of the installation site makes it significantly easier to install and
operate the heat pump. The following requirements must be met or considered:
-
An installation site outdoors
-
Protection from flooding, heavy rain or irrigation systems
-
Stable, level and waterproof ground
-
Required minimum distances to walls or objects (see Fig. E)
-
Required minimum distance of 2 m to the swimming pool
-
Easy connection to the water pipes
-
Easy connection to the power supply
-
Easy access to the display
-
An option to drain condensate
-
Environment insensitive to vibrations and sound
For even more efficient use of the heat pump, we additionally recommend our
Steinbach bypass set (item no. 060045).
Preparing the installation site
35

Publicité

Table des Matières
loading

Table des Matières