Installation; Installing Adapter On Hose End; Connecting The Lines; Display - Steinbach BP-39WS-B Mini Mode D'emploi

Masquer les pouces Voir aussi pour BP-39WS-B Mini:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 160

Installation

Installing adapter on hose end

1
2
When using a filter system, this must be connected upstream from the heat pump so
that the filtered water flows through the heat pump.
1. Remove coarse dirt from the connection points of the heat pump
hose ends of the water pipes.
2. Screw an adapter
3. Screw an adapter
4. Connect the hose end of the drain with a hose clamp
connection output
5. Connect the hose end of the feed with a hose clamp
connection input
The adapters are installed on the hose ends.

Connecting the lines

Establishing the power supply
The MINI heat pump cannot be operated with an external timer and must be switched on/off via
the RCD adapter.
1. Connect the RCD adapter
The power supply has been established.
Connecting a drain hose for condensate (optional)
1. Insert the drain spout
2. Attach the drain hose (garden hose) for condensate to the drain spout
The drain hose for the condensate is connected.

Display

Standby mode

When in Standby mode, the heat pump is operationally ready but deactivated. Pressing the
On/Off button
15
switches the heat pump into the Operate mode.
After being switched on, the heat exchanger must first warm up before the heat pump is
ready for operation in the Operate mode. This process can take up to 90 seconds.
3
2
onto the output of the water connection
2
onto the input of the water connection
6
(see Fig.1).
7
(see Fig.1).
C
to the voltage supply set up at the installation site.
4
into the hole in the base plate.
1
, the adapters
6
.
7
.
3
and the adapter
3
and the adapter
4
2
and the
2
to the water
2
to the water
.
37

Publicité

Table des Matières
loading

Table des Matières