3/ INSTALLATION
Before proceeding with installation of the device, it is very important to check the following points :
Ensure that any hydraulic equipment is in good working order and is correctly sized. In particular, check
the flow of the filtration pump, the capacity of the filter and the diameter of the waterworks.
The maximum pressure of the water in the cell must not exceed 3 bars.
The device's treatment capacity should be adapted to the volume of water to be treated and in the
climate of the place of installation. In case of warm climate or in case of using drilling water, a device
designed to treat a volume of 100 m3 in moderate climate must be limited to a family swimming pool
of 80m3.
The installation area should be dry and properly ventilated, (maximal ambient temperature of use :
35°C) protected from rain, splashes, water spray, and UV radiation. Ensure that the pH corrector
product container is kept in a place sufficiently remote from any electrical equipment and any other
chemical product.
Failure to comply with this instruction will lead to abnormal oxidation of the metallic parts which could
result in complete breakdown of the device.
The assembly of the devices (according to the model) must be performed strictly in compliance with
the following layout diagram.
Uno Model
JUSTSALT UNO - JUSTSALT DUO - JUSTSALT PRO - PAPI004084MULTI1 - FR/EN/ES/IT - Rev.01.16
T assembly of the cell
6