Télécharger Imprimer la page

LEGRAND KEOR HPE Manuel De Fonctionnement page 68

400-500 kva
Masquer les pouces Voir aussi pour KEOR HPE:

Publicité

Les langues disponibles

Les langues disponibles

Installation and start-up of KEOR HPE UPS 400-500 kVA
Installation et démarrage de l'ASI KEOR HPE 400-500 kVA
Installazione e avviamento KEOR HPE UPS 400-500 kVA
1)
Close the rectifier input switch RCB. After some seconds the touch screen will start and will
show the UPS mimic diagram.
Picture 11 – UPS start-up page
2)
After the software loading phase the control logic will acquire the system status and the
operation of the RCB switch, and will show the operating sequences.
Picture 12 – Rectifier start-up
OMT87187 REV. A
43

Publicité

loading