Assembly Step 3: Switching The Device On - BWT bestaqua 22 HQ Notice De Montage Et D'utilisation

Masquer les pouces Voir aussi pour bestaqua 22 HQ:
Table des Matières

Publicité

Installation of the WCF Kit
Service work for BWT bestaqua 22, 24 , 26
3
Fig.5: Mounting of the hose adapter (2) and of the concentrate hose (3)
Please insert the hose adapter
has been snaps in a firmly manner.
Note: Please observe in the assembly of the flexible tubes that they don't be bent.

Assembly step 3: Switching the device on

Please carry out all commission steps in accordance with the Operating manual (OPM),
to take the RO unit into operation.
Open the feed water inlet again.
Insert the mains plug again.
Please switch the RO unit ON (the RO starts).
BWT Service document No. 107 - Rev. 02 – Installation of the WCF-Kit
2
W2
(2)
and after that the concentrate hose
(3)
until it
Page 3 of 3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bestaqua 24 hqBestaqua 26 hq

Table des Matières