6. Record of Commissioning
6.1.
Measures taken during installation:
The watertightness test was carried out and recorded by a qualified person in
accordance with the requirements from the relevant responsible authorities:
Date: ............................ Stamp
6.2.
Measures taken during commissioning:
4.
All tanks in the separator system were filled with fresh water.
Carried out by:
Signature Company responsible for the installation:
5.
The type approval plate was attached to the shaft structure.
Carried out by:
Signature:
6.
The operating manual was handed over.
Handed over by:
Signature Operator:
Note:
Any claims under the warranty can only be made if the completed commissioning report
is provided!
Operating Manual for KLsepa.pop Grease Separator System
6. Record of Commissioning
Signature
Company responsible for the installation:....................................
.............................................
..............................................
.............................................
..............................................
..............................................
...............................................
date: ............................
date: ............................
date: ..............................