Commissioning And Service - Graf UNIVERSAL-FILTER 3 Notice D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Before commissioning and at every inspection, the lifting out mechanism must be positioned at 90° to the
inlet so that no large objects such as leaves and twigs can catch on the handle. The straining filter is re-
moved for cleaning and the basket must be thoroughly cleaned with water until all the pores are open. It
is advised to clean every 4 to 5 weeks (more often in autumn due to more leaves and twigs) or according
to requirements.
The filter strainer basket must be lightly pressed into place taking care that the seal sits precisely after
every cleaning.
At the occasion of each inspection, the overflow siphon must be checked and flushed in necessary.
Otto Graf GmbH – Carl-Zeiss-Str. 2-6 – DE-79331 Teningen – Tel.: +49 7641 589-0 – Fax: +49 7641 589-50
GRAF Distribution S.A.R.L – 45, route d´Ernolsheim – FR-67120 Dachstein Gare – Tél.:+33 388 49-7310 – Fax: +33 388 49-3280
GRAF Iberica Tecnología del Plástico S.L. – Marquès Caldes de Montbui, 114 – ES-17003 Girona – Tel.: +34 972 913767 – Fax: +34 972 913766
GRAF UK Ltd – Target House – Thorpe Way Ind. Estate – Banbury – Oxfordshire – UK-OX16 4SP – Tel.: +44 1608 661-500 – Fax: + 44 1295 211333
mail@graf.info
www.graf.info
7.

Commissioning and service

14 / 26
2015-09

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

340020340021340022342002340107342041

Table des Matières